Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Winchester Bay Commercial Bldg. 2/22/22 2pm
The Project consists of the construction of an approximately 4000 square foot building, along wit... |
02/22/2022 | ||
Board of Supervisors AV System Upgrade 2/3/22 3pm
The system will include voice lift, video presentation and USB |
02/03/2022 | ||
City Hall EV Charging Station 2/24/22 2pm
• Install new panel and necessary equipment |
02/24/2022 | ||
Washington St. PS Pump Upgrade 2/17/22 2pm
The Project is composed of replacement of four (4) large sewer pumps, replacement of two (2) smal... |
01/25/2022 | 02/17/2022 | |
Highland – Glacier Sewer Repair 2/9/22 2pm
Repair sewer main displacements in 3 locations on Highland and 2 locations on Glacier. |
02/09/2022 | ||
North Canal Sewer Main 2/9/22 2pm
Replacement of asbestos concrete sewer mainline on North Canal Blvd between Maple and Larch Avenu... |
02/09/2022 | ||
N Pine St. Sidewalk & Path Improve 2/15/22 2pm
Construction of 8-foot wide concrete sidewalk & 8-foot asphalt paths including ADA improvemen... |
01/20/2022 | 02/15/2022 | |
Roof Maintenance Services 2/8/22 3pm
The City of Redding wishes to establish a contract with a qualified contractor to furnish on-call... |
02/08/2022 | ||
2022 Street Preservation 2/16/22 2pm
26 lane miles of asphalt concrete pavement restoration work. The pavement restoration treatments ... |
01/26/2022 | 02/16/2022 | |
Removal of Black Locust Trees 1/25/22 2pm
Removal of Black L... |
01/25/2022 | ||
Title | Site Walk Through | Deadline |