Title | Site Walk Through | Deadline | |
---|---|---|---|
Clear Creek WWTP Pyrolysis Phase 1 7/19/22 3pm
• Installation of biodryers and pyrolysis units for biosolids treatment for solids reduction; | |||
Media Ctr. Drain Repair/Retaining Wall 7/7/22 2pm
Install foundation drains, replace steps, add new retaining walls and curbs, sidewalks and irri... |
06/22/2022 | 07/07/2022 | |
Outdoor Eating Spaces Phase 2 7/7/22 2pm
Supply and install Five (5) Outdoor Eating Spaces approximately 40’ x 60’ each, per MSD speci... |
06/22/2022 | 07/07/2022 | |
2022 Cape Seal Project 7/1/22 2pm
The work consists of placing an asphalt rubber binder chip seal, microsurfacing, and pavement del... |
07/01/2022 | ||
OIT South Landscape Project 6/30/22 1pm
Landscape of two areas directly south of the new CEET Building. This project includes the install... |
06/16/2022 | 06/30/2022 | |
Salmon Harbor Marina Dredging 6/30/22 2pm
Dredging approximately (up to) 20,000 cubic yards of river sediment from two locations in Winches... |
06/30/2022 | ||
Yreka Fuels Reduction Project 7/15/22 5pm
Hazardous fuels reduction activities required for the treatment of 50 acres and defensible space ... |
06/23/2022 | 07/15/2022 | |
Crescent Elk MS Emergency Generator 6/28/22 2pm
Provide & install emergency generator per specifications. |
06/15/2022 | 06/28/2022 | |
Deschutes Co. Fair & Expo HVAC & Controls 7/22/22 2pm
Implement Energy Trust energy saving protocols to modernize Deschutes County |
06/23/2022 | 07/22/2022 | |
Video Inspection Sewer Lines & Manholes 7/18/22 2pm
NASSCO PACP-Certified Closed-Circuit Television (CCTV) pipeline inspection of 133,215 ft. of grav... |
07/18/2022 | ||
Title | Site Walk Through | Deadline |