Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
OR39 Chip Seal Matney-Ca. St. Line 7/6/22 2pm
Chip Seal of OR 39 and associated work. The work also includes performing all |
07/06/2022 | ||
EWEB West Eugene EWS Near Kennedy 7/14/22 2pm
Construct, develop, test, and commission new water wells in West Eugene. |
06/29/2022 | 07/14/2022 | |
Waterline Improve NW Deer 1st to 3rd St. 7/19/22 2pm
Upgrade an existing 6″ waterline between West 1st Street & NW 3rd street on NW Deer Str... |
07/07/2022 | 07/19/2022 | |
Remove Underground Storage Tank Re-Bid 9/2/22 2pm
The work of this project consists of the removal and disposal of one steel single wall |
09/02/2022 | ||
Replace Ranger Foundation Post 7/26/22 2pm
The work of this project consists of replacement |
07/26/2022 | ||
Replace Oak Bottom Water & Sewer 7/28/22 3pm
The Work consists of the removal and replacement of the existing potable water |
07/28/2022 | ||
Scenic Middle School MEP Upgrades 7/6/22 2pm
Upgrades to the existing Mechanical, Electrical and Plumbing systems, including installation, rep... |
06/24/2022 | 07/06/2022 | |
Juniper Swim & Fitness Pool Repair 7/6/22 2pm
Renovation work to two outdoor pools, a 50-meter by 20-meter competition pool with moveable bulkh... |
07/06/2022 | ||
Roof Replace & Asbestos Abatement 7/5/22 3pm
Abate and replace the roof at the Public Health building located at 810 S Main, Yreka, and the ... |
06/27/2022 | 07/05/2022 | |
City Hall ADA Remodel 8/1/22 5pm
1. The ADA-compliant redesign and expansion of the City Hall front counter, lobby, staff restroom... |
08/01/2022 | ||
Title | Site Walk Through | Deadline |