Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Office Covered Bridge Old Mill Rd. 3/22/22 10am
This project is to clean, prepare and paint interior and exterior existing painted surfaces of th... |
03/22/2022 | ||
EC Cares 100 101 Reception Remodel 3/23/22 2pm
The Project includes a remodel of the reception and entry |
03/02/2022 | 03/23/2022 | |
Butler Market Wells & Boyd Acres Improve 3/29/22 3pm
Provide the design services necessary for the Butler Market & Wells Acres & Boyd Acres Im... |
03/29/2022 | ||
CBNB Water Board Project 3/17/22 2pm
Work consists of wall repair, casework replacement, Diebold |
03/07/2022 | 03/17/2022 | |
SSSD Phase 4 Sewer Line Rehab 3/15/22 2pm
Complete 27 lateral rehabilitations and 4,629 lineal feet of cured in place sewer pipe repairs. | 03/15/2022 | ||
Design Build Muni Pool Replace 3/7/22 2pm
This request for proposals is for a design-build contract intended to replace the existing pool r... |
03/07/2022 | ||
2022 Lane Co. Slurry Seal Project 3/15/22 10am
The approximate quantities are: 275,000 square yards of Type II Slurry Seal and all other work ca... |
03/15/2022 | ||
2022 Site Improvement Modoc HS 3/15/22 2pm
The work at Modoc High School consists of Surface preparation and 2 inch HMA overlays; performing... |
03/01/2022 | 03/15/2022 | |
Brophy Pump Station Abandonment 3/8/22 2:15 pm
The construction of 1,305 feet of 8 inch gravity sewer, 647 feet of 4 inch pressure sewer, 6 manh... |
03/02/2022 | 03/08/2022 | |
Centennial Overlay Aspen to Prescott 3/16/22 2pm
The Project consists of a pavement inlay; Americans with Disability Act (ADA) upgrades to existin... |
02/28/2022 | 03/16/2022 | |
Title | Site Walk Through | Deadline |