Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Eugene Enhanced Walking Network Rebid 11/3/22 2pm
Construction of concrete sidewalk and sidewalk ramps; Asphalt pavement repairs; Permanent pavemen... |
11/03/2022 | ||
|
River Road & Irving Road Upgrade 9/13/22 2pm
Reconstruction of existing road; Milling of existing asphalt; Asphalt paving; Construction of con... |
09/13/2022 | ||
|
Engineer for Culvert Replace Hunsacker Ln. 9/12/22 4:30pm
Professional engineering services for removal and replacement of two existing culverts located ne... |
09/12/2022 | ||
|
Passenger Walkway Canopy Eugene Airport 9/22/22 2:30pm
Construction of a new approximately 505′ long canopy over an existing walkway at the Eugene... |
09/01/2022 | 09/22/2022 | |
|
McKenzie River Intake Design Services 9/9/22 4pm
This project consists of designing a new intake and raw water pump station, which utilizes the Mc... |
09/01/2022 | 09/09/2022 | |
|
Cherry Street Meats 9/13/22 2pm
Requesting bid proposals from suppliers and subcontractors for all trades but not limited to: St... |
09/13/2022 | ||
|
Arch Svcs. Fire Station Modernization 9/22/22 3pm
The effort associated with this project will require two separate phases. Phase 1 will involve pr... |
09/22/2022 | ||
|
STP1 & STP2 Outfall Inspections 9/9/22 4pm
Inspection of two wastewater outfalls. Consultants must be on a bidders list prior to September 1... |
09/09/2022 | ||
|
Lower Deadfall Meadows Eddy Crk Trail Restore 9/12/22 3pm
Lower Deadfall Meadows Trail – improve non-motorized trail access in conjunction with mitigati... |
08/25/2022 | 09/12/2022 | |
|
Maxwell Rd. ADA Improvements 9/13/22 10am
Cold plane pavement removal 2 inch deep, 1,200 square yards; level 3, ½ inch, ACP Mixture, 350 t... |
09/13/2022 | ||
| Title | Site Walk Through | Deadline |