Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
YUSD Jackson St. School HVAC Rebid 5/24/22 11am
1. Remove existing HVAC system at Classrooms, Student Restrooms, and Hallways Located in Wings #1... |
05/24/2022 | ||
Jackson Co. Hot Mixed Asphalt 3/25/22 10:15am
Furnishing hot mixed asphalt concrete for two scheduled projects totaling 14,500 tons |
03/25/2022 | ||
Jackson Co. Emulsified Asphalt 3/25/22 10am
Furnishing and delivering emulsified asphalt products |
03/25/2022 | ||
Jackson Co. Aggregate Supply 3/25/22 10:30am
Supplying at least 18,000 tons of driving surfacing aggregate to various locations. |
03/25/2022 | ||
CCTV Inspection City of Powers 3/23/22 2pm
Furnishing all labor, equipment, materials and supervision for the CCTV |
03/17/2022 | 03/23/2022 | |
Cape Seal 2022 3/30/22 3pm
This project includes applying a polymer modified rejuvenating chip seal and polymer modified rub... |
03/30/2022 | ||
Transition Center Work Shop Replace 3/29/22 2pm
This turn-key project will replace the previous 20′ x 30′ work shop lost to Alameda W... |
03/10/2022 | 03/29/2022 | |
Tulelake HS & ES Renovation 3/22/22 4pm
Trades involved include but are not limited to: site concrete, concrete cutting, concrete, rough ... |
03/09/2022 | 03/22/2022 | |
Les Schwab Springfield Remodel 3/29/22 4pm
Asbestos abatement, selective building demolition, concrete removal, minor excavation |
03/10/2022 | 03/29/2022 | |
Interstate 5 MP28-27 Rebid 3/29/22 3pm
Grind inlay pavement preservation and striping. |
03/29/2022 | ||
Title | Site Walk Through | Deadline |