Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Cape Seal 2022 3/30/22 3pm
This project includes applying a polymer modified rejuvenating chip seal and polymer modified rub... |
03/30/2022 | ||
Transition Center Work Shop Replace 3/29/22 2pm
This turn-key project will replace the previous 20′ x 30′ work shop lost to Alameda W... |
03/10/2022 | 03/29/2022 | |
Tulelake HS & ES Renovation 3/22/22 4pm
Trades involved include but are not limited to: site concrete, concrete cutting, concrete, rough ... |
03/09/2022 | 03/22/2022 | |
Les Schwab Springfield Remodel 3/29/22 4pm
Asbestos abatement, selective building demolition, concrete removal, minor excavation |
03/10/2022 | 03/29/2022 | |
Interstate 5 MP28-27 Rebid 3/29/22 3pm
Grind inlay pavement preservation and striping. |
03/29/2022 | ||
Willamette River Pedestrian Bridge 3/16/22 2:30pm
Bridge washing and cleaning; Concrete and crack sealer; Concrete repair; Grout replacement for li... |
03/16/2022 | ||
Lake District Hospital Remodel 4/6/22 5pm
Occupational Therapy Rehab and Activity Room Remodel |
04/06/2022 | ||
Ashland Library HVAC Upgrade 4/7/22 2pm
The objective of this project is to replace aged HVAC equipment at the Ashland branch Library. | 03/11/2022 | 04/07/2022 | |
Boiler BEI Testing & Boiler Tuning 3/11/22 9am
The Contractor shall conduct annual safety device testing to three boilersusing the most recent V... |
03/11/2022 | ||
Anderson HS Tank Recoating 3/23/22 2pm
The project involves all preparation, removal and legal disposal of potential lead based paint, m... |
03/17/2022 | 03/23/2022 | |
Title | Site Walk Through | Deadline |