Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
I-5 District 7 Drainage Modifications 10/10/22 3pm
Provide work zone traffic control. |
10/10/2022 | ||
|
OR66 Over RR Bridge & E Main 10/13/22 9am
1. Install and remove temporary work access and containment measures. |
10/13/2022 | ||
|
Prof of Record Seismic Retro Jacksonville Elem 10/25/22 2pm
The District is seeking proposals for the architectural, structural, mechanical and electrical de... |
09/30/2022 | 10/25/2022 | |
|
Morrill Bridge Replacement 10/19/22 2pm
Construct new gravel roadway along a new alignment. Install required guardrails. Construct new 10... |
10/05/2022 | 10/19/2022 | |
|
Office Remodel ODOT District 11 10/4/22 11am
Work includes constructing 2×4 walls, installing 2 new wood doors in hollow metal frames wit... |
09/20/2022 | 10/04/2022 | |
|
Lilac Meadow Heat Pump Systems 9/30/22 2pm
• Safely disable existing Electrical and Natural Gas for removal and reconnection of new equipm... |
09/30/2022 | ||
|
City Council Chambers AV Upgrade 10/25/22 3pm
This project consists of the installation of an audiovisual systems, including equipment and mate... |
10/25/2022 | ||
|
Wagner Creek Bridge Strengthening 10/20/22 2pm
Complete bridge strengthening via near surface mounted carbon fiber polymer reinforcing located a... |
10/20/2022 | ||
|
U of O KCASI BP #2.2 – Excavation, Shoring & Tree Relocation 10/13/22 2pm
Seeking sub bids for excavation, shoring & tree location. |
09/26/2022 | 10/13/2022 | |
|
U of O KCASI Steel, Glazing, Concrete 10/13/22 2pm
Seeking sub bids for Steel Modeling, Glazing and Concrete. |
09/26/2022 | 10/13/2022 | |
| Title | Site Walk Through | Deadline |