Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Currin Substation Rebuild 10/19/22 2pm
Construction services to rebuild the Currin substation located at 0000 N. Garden Way in Eugene. T... |
09/21/2022 | 10/19/2022 | |
|
BLSD Architectural Design Services 10/5/22 2pm
The District is requesting architectural services for the design and construction of these |
10/05/2022 | ||
|
High Street Protected Bikeway **Cancelled**
Concrete sidewalk and sidewalk ramps; Asphalt pavement repairs; Concrete traffic separator curb; ... |
10/04/2022 | ||
|
Foothill Road Pipe Procurement 10/12/22 3pm
Provide fabricated ductile iron pipe, valves, fittings, and accessories delivered F.O.B. to a loc... |
09/20/2022 | 10/12/2022 | |
|
Student Housing Design Build 10/11/22 2pm
Two-Step Request for Proposals process to retain one (1) Design Build team to provide design buil... |
09/19/2022 | 10/11/2022 | |
|
Redding Riverfront Specific Plan 10/21/22 3pm
Development and revitalization of public and private |
10/21/2022 | ||
|
Larkspur Center Re-Roofing 9/27/22 2pm
Removal of existing EPDM (ethylene propylene diene terpolymer) roof system & installation of ... |
09/15/2022 | 09/27/2022 | |
|
Goodpasture Island over Delta Hwy Bridge 10/10/22 2:30pm
City of Eugene is seeking proposals from qualified engineering consultants to analyze the Goodpas... |
10/10/2022 | ||
|
Facility Assessment & Long Range Plan 10/13/22 2pm
The Three Rivers School District, Grants Pass, Oregon, is seeking proposals from qualified firms ... |
10/13/2022 | ||
|
8th Ave. Streetscape & Bikeway **Cancelled**
Cold plane removal of existing asphalt surfaces; Asphalt paving; Roadway reconstruction; Wastewat... |
10/06/2022 | ||
| Title | Site Walk Through | Deadline |