Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Spring Garden Gold Hill 4/23/21 5pm
Extensive renovation of apartment complex in Gold Hill |
04/12/2021 | 04/23/2021 | |
Spillway Concrete Crack & Joint Repair 4/15/21 2pm
Construction services to repair the forebay and spillway at EWEB’s Walterville Hydroelectri... |
04/15/2021 | ||
RFQ Trucking Services 4/21/21 2pm
The City of Medford is seeking quotes to enter as-needed contracts for dump truck services from J... |
04/21/2021 | ||
Apron Reconstruction Gold Beach Airport 4/29/21 2pm
Reconstruct new Apron pavement section • Base Bid approx. 3,000 SY • Bid Additive approx. 500... |
04/20/2021 | 04/29/2021 | |
Pump Station Decommission Phase 3 5/12/21 2pm
Trenching and installation of gravity sewer pipeline at depths of 6 to 27 feet, sewer main pipe d... |
04/20/2021 | 05/12/2021 | |
Multi Site Track Resurfacing 4/22/21 2pm
Briefly the work is described as: Preparing, coating and restriping synthetic track surfaces at C... |
04/08/2021 | 04/22/2021 | |
Terwer Well Pump Installation 5/13/21 2pm
Connect existing well to the Klamath Glen water distribution system. |
04/14/2021 | 05/13/2021 | |
D10 Pavement Patching US97 4/19/21 2pm
Filling both wheel ruts with HMAC in both travel lanes between MP 116.1 – MP117.24 and in t... |
04/19/2021 | ||
Vessel Disposal Pelican Marina 4/18/21 5pm
The project involves removing the vessel from its current location, dismantling of the vessel in ... |
04/18/2021 | ||
KCR Construction Project Phase 1 4/27/21 2pm
This project consists of site demolition, relocation of existing bus stop, relocation of existing... |
04/08/2021 | 04/27/2021 | |
Title | Site Walk Through | Deadline |