Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Carpenterville Hwy MP355 Culvert Replace 11/15/22 3pm
Removal of an existing 18 inch Culvert and Replacement with new 24 inch double walled corrugated ... |
11/15/2022 | ||
|
Spyglass Drive Paving 11/22/22 2pm
Construction of concrete sidewalk access ramps, curb and gutter; Rotomilling; Asphalt Paving; Sto... |
11/22/2022 | ||
|
Klamath Co. Vehicle & Timber Storage Sheds 12/1/22 2pm
Construct two new metal sheds; one for vehicle storage and, the other to shelters bridge material... |
11/08/2022 | 12/01/2022 | |
|
Anderson Avista Apartments 11/29/22 2pm
Project includes construction of three new two-story wood frame apartment buildings, and rehabili... |
11/04/2022 | 11/29/2022 | |
|
F-15 Static Display CM/GC 11/30/22 2pm
The City of Klamath Falls received a retired F-15 aircraft from the Oregon Air National Guard to ... |
11/09/2022 | 11/30/2022 | |
|
Eugene Riverfront Parcel 3BC 11/30/22 2pm
Portal is a new (4) story apartment building with a basement. The project will consist of (3) sto... |
11/30/2022 | ||
|
2022 District 7 Access Gate Install 11/18/22 2pm
Install State furnished access gates at I-5: SB MP 116.2 – south of Roberts Mountain crest ... |
11/18/2022 | ||
|
Landscape Maintenance Services 11/22/22 2pm
The Eugene School District wishes to establish a contract with a vendor or vendors to provide lan... |
11/09/2022 | 11/22/2022 | |
|
Eagle Point HS Ag Arena 11/29/22 2pm
The Arena will be an 80 by 200 foot pre-engineered metal building with a slab floor. The structur... |
11/08/2022 | 11/29/2022 | |
|
Bridge Preventive Maintenance 12/6/22 2pm
The work to be done consists of traffic control, cleaning bridge expansion joints, replacing join... |
12/06/2022 | ||
| Title | Site Walk Through | Deadline |