Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Accent Wall Painting OIT Klamath Falls 11/2/22 1pm
Prep and paint twenty-four (24) accent walls in the Owens Hall building and Purvine Hall building... |
11/02/2022 | ||
Hugh Hartman Elementary CM/GC 11/16/22 2pm
1. Provide complete and functioning Building automation system. Pneumatic controls will |
10/27/2022 | 11/16/2022 | |
Rice Creek Bridge Replacement 11/16/22 8:30am
Install and maintain temporary traffic control and erosion control measures, replace bridge struc... |
11/16/2022 | ||
5-Year Water Distribution Main Replace 11/15/22 2pm
Engineering services for the City of Roseburg’s Five-Year Water Distribution Main Replacement P... |
11/15/2022 | ||
ADA Ramps City of Medford 11/1/22 2pm
Work includes removal of concrete sidewalks (curbs and gutters), construction of new sidewalks wi... |
11/01/2022 | ||
Olney Pedestrian & Bike Improve 11/17/22 3pm
Design development for the Olney Pedestrian & Bike Improvements. The improvements consist of ... |
10/31/2022 | 11/17/2022 | |
Nova Avenue Storm Drain 11/2/22 2pm
90 LF Saw Cutting of Asphalt and Concrete |
11/02/2022 | ||
WWTP Influent Gate Replacement 10/25/22 2pm
The project includes demolition and removal of the existing gate, hydraulic actuator, and float c... |
10/25/2022 | ||
Kelley Engineering Cooling Dist CM/GC 11/8/22 2pm
Contractor shall provide preconstruction services including a kick-off meeting, existing conditio... |
10/17/2022 | 11/08/2022 | |
515 Century Drive 11/3/22 2pm
The project consists of a new 150,000 SF apartment building consisting of four levels of wood fra... |
11/03/2022 | ||
Title | Site Walk Through | Deadline |