Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
OR138 & OR234 Bridges 5/12/22 9am
1. Install temporary traffic control. |
05/12/2022 | ||
System Upgrade at Former Steam Plant 5/6/22 4pm
Designing and implementing a security system at the former Steam Plant in downtown Eugene. |
05/06/2022 | ||
Airfield Electrical Lighting Materials 5/11/22 2pm
Project consists of material purchases required to replace lighting associated with Runway 14-32 ... |
05/03/2022 | 05/11/2022 | |
Hugh Hartman Mechanical Upgrade Rebid 6/1/22 2pm
The scope of work will consist of disconnect and removal of two existing gas cast iron boilers wi... |
05/20/2022 | 06/01/2022 | |
Heritage Renovation Project 5/10/22 2pm
The Heritage Project will fully renovate and restore historic University Hall and Villard Hall, b... |
04/28/2022 | 05/10/2022 | |
South 28th Sewer Extension 5/11/22 2pm
This project consists of the extension of an existing gravity wastewater pipeline along S 28th St... |
04/26/2022 | 05/11/2022 | |
Provision of Electrical Components 5/5/22 2:30pm
Providing switch gear, transformer, and related electrical products. This ITB does not include in... |
04/28/2022 | 05/05/2022 | |
Slurry Seal Winchester Bay 5/4/22 8:30am
Implement temporary traffic control, perform crack sealing, construct emulsified asphalt slurry s... |
05/04/2022 | ||
Crow Middle/HS Locker Room Refurbish 4/27/22 3:30pm
The work consists of ceramic tile repair and replacement, ceiling tile replacement, rubber base, ... |
04/19/2022 | 04/27/2022 | |
LED Lighting Retrofit Various 5/19/22 3pm
This project will replace and retrofit existing light fixtures at various locations throughout th... |
05/05/2022 | 05/19/2022 | |
Title | Site Walk Through | Deadline |