Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
OR62 Lost Creek Lake Bridge 2/5/26 9am
Jackson Co. Or. Contact: Ricky Zeedyk |
02/05/2026 | ||
|
Supply & Haul Crushed Uncoated Rock for Chip Seal 1/28/26 2pm
Deschutes Co. Or. Contact: Brett Hamrick |
01/28/2026 | ||
|
Multi Site HVAC Upgrades Phase 1 2/4/24 2pm
Eugene, Or. Pre-Bid: Mandatory 1/21 10am at the district Facilities Serv... |
01/21/2026 | 02/04/2026 | |
|
Architect Engineer Pricing Agreement Pool 2/4/26 5pm
Lane Co. Or. Contact: E Wood |
02/04/2026 | ||
|
Project Engineering Services 7 Million Gallon Water Treatment Plant 2/12/26 2pm
Ashland, Or. Contact: Scott Fleury |
02/12/2026 | ||
|
Recycling & Related Services 2/11/26 2:30pm
Eugene, Or. Contact: Michelle Hahn |
02/11/2026 | ||
|
Ductile Iron Pipe 2/16/26 2pm
Eugene, Or. Contact: Sandra Hahn |
02/16/2026 | ||
|
Elephant Bar Habitat Enhancement 2/10/26 3pm
Gold Beach, Or. Pre-Bid: Mandatory 1/27 3pm 6 at the Freeman Rock, Inc. ... |
01/27/2026 | 02/10/2026 | |
|
Sutherlin Police Station Seismic Retrofit Phase 2 2/5/26 4pm
Sutherlin, Or. Pre-Bid: Mandatory 1/21 11am at 126 E Central Ave, Sutherl... |
01/21/2026 | 02/05/2026 | |
|
Coburg Collector Street Reconstruction 2/24/26 2pm
Coburg, Or. Contact: Zharita Zurita Alfaro |
02/24/2026 | ||
| Title | Site Walk Through | Deadline |