| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| OR58 Seismic Landslide Mitigation 1/15/26 9am Lane Co. Or. Pre-Bid: Mandatory 12/2 10am via Microsoft Teams. The link for the meeting will be post... | 12/02/2025 | 01/15/2026 | |
| Jackson & Josephine Co. Curb Ramps Phase 3 12/11/25 9am Jackson & Josephine Co. Or. Contact: Roger Thom Email: roger.thom@odot.oregon.gov Addendum:1 Des... | 12/11/2025 | ||
| Curry Health Network Master Space Planning 12/31/25 3pm Curry Co. Or. Pre-Bid: Non-Mandatory 12/1 11am via Webex Contact: Rebecca Vance Phone: 541.247.3180 ... | 12/01/2025 | 12/31/2025 | |
| Roof Maintenance and Repair in Medford 12/2/25 11am Medford, Or. Pre-Bid: Mandatory 11/20 11am at 119 N Oakdale Avenue, Medford, OR Contact: Ali Tate Ph... | 11/20/2025 | 12/02/2025 | |
| Roof Maintenance & Repair in Eugene 12/2/25 9am Eugene, Or. Pre-Bid: Mandatory 11/19 1pm at 2510 Oakmont Way, Eugene, OR Contact: Ali Tate Phone: 50... | 11/19/2025 | 12/02/2025 | |
| Clear Lake Road Wastewater Extension Design 1/7/26 2:30pm Eugene, Or. Contact: Michelle Hahn Phone: (541) 682-5051 Email: MHahn@eugene-or.gov Description: Pro... | 01/07/2026 | ||
| River Road & Hwy 99 Corridor Study 12/16/25 2:30pm Eugene, Or. Contact: Michelle Hahn Phone: (541) 682-5051 Email: MHahn@eugene-or.gov Addendum:2 Descr... | 12/16/2025 | ||
| 1st Street Pavement Maintenance 12/17/25 2pm Phoenix, Or. Contact: Chris Stephenson Phone: 541-651-9161 Email: chris.stephenson@phoenixoregon.gov... | 12/17/2025 | ||
| Pony Creek Pump Discharge Line Tunnel 12/17/25 2pm Coos Bay, Or. Contact: Joseph Goette, PE Phone: (541) 269-0732 Email: jgoette@dyerpart.com Addendum:... | 12/17/2025 | ||
| Painter St. Sewer Line Replacement 1/7/26 2pm Rio Dell, Ca. Pre-Bid: Non-Mandatory 12/11 10am at 475 Hilltop Dr, Rio Dell, CA. The conference may ... | 12/11/2025 | 01/07/2026 | |
| Title | Site Walk Through | Deadline |