| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Northeast Crossing Trail Phase One 9/3/20 Prepare and pave 2,740 linear feet of 10-foot-wide pedestrian trail crossing Boulder Creek. Asphalt ... | 09/03/2020 | ||
| Annual Fire Sprinkler Inspection 8/31/20 3pm Conduct annual I/A/W NFPA 25 inspection on all water based fire protection systems on the Southern ... | 08/25/2020 | ||
| Front St. Hemlock to Greenwood 8/18/20 2pm | - | ||
| ITB Sewage Treatment Sys Upgrade 8/18/20 2pm Establish a Contract for the new sewage treatment system to serve Lincoln Savage Middle School, loca... | 08/18/2020 | ||
| BLM Medford Restroom & HVAC 9/9/20 4pm 1 Removal and replacement of existing plumbing fixtures at the Medford Interagency Office Building.... | 08/31/2020 | ||
| POR Central Gym Seismic Retrofit 9/2/20 2pm | 09/02/2020 | ||
| Karuk Medical Clinic HVAC 8/21/20 5pm | 08/21/2020 | ||
| Kerr Admin Fire Alarm Upgrade 9/3/20 2pm The Work consists of the installation of a new fire alarm system in Kerr Administration Building and... | 08/17/2020 | 09/03/2020 | |
| Single Phase Pad Type Transformers 8/26/20 3pm | 08/26/2020 | ||
| Cher-Ae-Heights Casino 8/10/20 4pm | 08/10/2020 | ||
| Title | Site Walk Through | Deadline |