| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| CM/GC Madison School Renovation 9/21/20 2pm The project includes building an addition to the existing building, replacement of existing modular ... | 09/02/2020 | 09/21/2020 | |
| Reservoir Cleaning & Inspection 9/22/20 3pm This project includes cleaning, cleaning waste discharge, and inspection at twelve (12) of the City&... | 09/22/2020 | ||
| Key and Core Replacement 9/7/20 3:00pm Design, purchase and installation of cores and keys to provide a secured and tracked key system for ... | 09/07/2020 | ||
| OIT Athletics AV System Equipment 8/31/20 1pm Procure audio and visual equipment for the Oregon Tech Athletics Building at the Oregon Tech Klamath... | 08/31/2020 | ||
| US 101 Johnson Ave. Intersection 9/10/20 9am The Work to be done under this Contract consists of the following: Install temporary traffic contro... | 09/10/2020 | ||
| Elk Ranch Roadway 9/8/20 4pm In general, the work includes the furnishing of the labor, materials, and equipment for the construc... | 09/01/2020 | ||
| Ashland Middle School Project 9/24/20 2pm Demolition, Concrete, Masonry, Structural Steel Framing, Steel Decking, Metal Fabrications, Aluminum... | 08/27/2020 | 09/24/2020 | |
| Klamath Wildlife Area Island Divergement/ Fish Screen 9/17/20 2pm Contractor shall provide all necessary expertise, labor, equipment, materials, incidentals, and perm... | 08/31/2020 | 09/17/2020 | |
| Fern Ridge Wildlife Area Enhancement 9/9/20 2pm Contractor shall provide all necessary expertise, labor, equipment, materials, incidentals, and perm... | 08/24/2020 | 09/09/2020 | |
| OR140 Crack Sealing 9/3/20 2pm This project scope consists of supplying all labor, material, equipment, mobilization, machinery and... | 09/03/2020 | ||
| Title | Site Walk Through | Deadline |