| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| RHMA-G HMA & Concrete Barrier 10/22/20 2pm In Humboldt County In And Near Eureka From 0.8 Mile South Of Tompkins Hill Road Overhead To 0.4 Mile... | 10/22/2020 | ||
| Klamath Boat Marina to Lakeshore 10/8/20 2pm This project is to widen a six mile stretch of roadway along OR 140 to accommodate current and futur... | 10/08/2020 | ||
| Street Striping Project 9/29/20 2pm Repainting approximately: Approx. 171,500 total lf of yellow center line (Includes 4″ single y... | 09/29/2020 | ||
| Flooring at City Hall Common Areas 10/1/20 3pm Contractor shall furnish equipment, material, and labor for the installation of commercial grade Man... | 10/01/2020 | ||
| Churchill High School Wood Shop Remodel 9/22/20 2pm Renovation of an existing large classroom into a Wood Shop. The Project will be a single design and ... | 09/22/2020 | ||
| Phoenix Elementary Seismic Upgrade 10/8/20 2pm Seismic renovation of the Phoenix Elementary School. MEP subs have been pre-selected. | 10/08/2020 | ||
| Stylus Development Apartments 9/30/20 2pm Project consists of construction of a new 36-unit apartment building and related site improvements. ... | 09/30/2020 | ||
| Replace Concrete Curb Sidewalk Driveway 10/13/20 2pm Replace minor concrete at curb, sidewalk, driveway & curb ramp. In Humboldt County In Eureka Fro... | 10/13/2020 | ||
| Kelley Connect Office Building 9/24/20 12pm Ground up, wood framed, 2 story class A office building, Build out of 1st floor, 2nd floor shell. ME... | 09/24/2020 | ||
| Street Striping & Pavement Marking 9/25/20 3pm The work performed under this contract shall include the furnishing of all labor (at prevailing wage... | 09/25/2020 | ||
| Title | Site Walk Through | Deadline |