| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Avion Water Office Building 10/14/20 2pm New construction of a 6,702 square foot office building located at the NW corner of China Hat Road a... | 10/07/2020 | 10/14/2020 | |
| Victorie Way & Grange St. Storm Drain 10/17/20 3pm The project includes replacement of approximately 200 linear feet of 24” reinforced concrete pipe an... | 10/17/2020 | ||
| Short Mountain Flare Supply 10/9/20 5pm Provide a Landfill Methane Gas Candlestock flare (2000 scfm CSF), Blower Skid (2000 scfm centrifugal... | 10/09/2020 | ||
| US101 Munsel to OR126 10/22/20 9am Grading, paving, signing & curb ramps | 10/22/2020 | ||
| US97 Nels Anderson Romaine Village 10/22/20 9am Grading, drainage, structures, paving, curb ramps, signing & signals | 10/22/2020 | ||
| Metal Roof Installation 10/7/20 4pm Installation of insulation and metal roof with a 4/12 pitch on a 40x60x24 metal building. All mater... | 10/07/2020 | ||
| Leachate Pond & Floating Cover Replace 12/16/20 10am Remove and dispose of existing floating cover system into onsite landfill; remove estimated 500,000 ... | 12/16/2020 | ||
| South Hills 4th Level Reservoir 11/12/20 2pm Construction of a new South Hills 4th Level Reservoir, a 0.46-million-gallon (MG) ground level welde... | 10/07/2020 | 11/12/2020 | |
| ZIRC Annex Abatement & Demolition 10/13/20 2pm Asbestos Abatement and demolition of a 20′ x 50′ metal building located on the North Sid... | 10/13/2020 | ||
| 36th Avenue Water Main Replacement 10/20/20 2pm Water main replacement on 36th Ave Crest Dr to Monroe St. in Eugene OR. | 10/20/2020 | ||
| Title | Site Walk Through | Deadline |