| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Klamath Tribes Courthouse Heat Pump 11/30/20 12pm Recover refrigerant from existing roof top 5 Ton unit. Remove 5 Ton unit from roof top. Install a Cu... | 11/13/2020 | ||
| Klamath Tribes ADA Bathroom 11/6/20 12pm Retrofit into the existing water supply to support a flush o matic ADA toilet in the changing room o... | 11/06/2020 | ||
| 2020 Knott Landfill Extraction Well 11/19/20 3pm Drilling and installation of six landfill gas (LFG) extraction wells at Knott Landfill, 61050 SE 27t... | 11/19/2020 | ||
| Bulk Fuel Delivery 11/18/20 3pm The City of Redding wishes to contract with a responsible vendor to furnish and deliver bulk fuel fo... | 11/18/2020 | ||
| HVAC Maintenance Repair Replace 11/13/20 3pm Provide maintenance and services to the HVAC system and equipment replacement at OED’s Klamath... | 11/13/2020 | ||
| OR140 Delineators 11/12/20 2pm Replacing roadside, off-ramp and on-ramp delineators. Contractor shall remove and dispose of existin... | 11/11/2020 | ||
| Cascade Office Building Revisions 12/7/20 3pm Architectural and Engineering Services for design and construction review services for a minor inter... | 12/07/2020 | ||
| Consultant Svcs. Clear Creek WWTP 11/20/20 3pm Task 1: Project Management Review and Scheduling Task 2: Data Collection and Evaluation of Existing ... | 11/20/2020 | ||
| Bridgestone Firestone Complete Auto Care 11/18/20 5pm This project is a ground up. Trades required for this are listed as follows: Surveying, Earthwork, S... | 11/18/2020 | ||
| US101 MP 332 Slope Failure 11/5/20 3pm Perform landslide mitigation services including, but not limited to,installation of a subsurface dra... | 11/05/2020 | ||