Hours Monday-Friday 8am-4pm
Open to the public

Search

Filter

By Bid Date

Enter the FROM Bid Date to filter.
Enter the TO Bid Date to filter.

By City

Select City Please*

By CSI Division


Filter to show only active postings.
Title Site Walk Through Deadline
Trinity Way Waterline Extension 2/16/21 2pm Construction of an 8-inch water main, a 1” copper water service, trenching and patching, and 30-feet... 02/16/2021
South Barney Sewer Project 2/10/21 4pm The Project consists of the construction of approximately 1,575 feet of 8-inch sewer main, 7 manhole... 02/10/2021
Pedestrian Crossing Improvements 2/16/21 2:00pm Mobilization, traffic control, removing existing sidewalk and installing bulb-outs, curb ramps, new ... 02/16/2021
Remove & Replace Rooftop Griffin Creek 2/17/21 2pm Establish a firm fixed price contract with one qualified source to perform removal, disposal and rep... 01/29/2021 02/17/2021
Gangnes Dr. Sewer Realignment 2/9/21 2:15pm The construction of 1,505 feet of 8 inch sanitary sewer pipe along with associated service laterals ... 02/09/2021
Middletown PRV Improvements 2/18/21 4pm This project will include the removal of an existing check valve and the construction of a new press... 02/18/2021
Installation of ADA Operators 2/8/21 3pm Supply and install all required components needed to add (7) ADA Operators and (14) Hands Free ADA O... 01/27/2021 02/08/2021
Emergency Power Generation Various 3/3/21 3pm The work consists of the demolition and replacement of multiple generation units throughout the univ... 02/04/2021 03/03/2021
Heritage Distilling TI 2/12/21 5pm The project involves a tenant improvement of retail space R-104 of the Gordon Lofts Project. The bui... 02/12/2021
Medford Water Point of Entry 2/16/21 2pm The Work to be performed under these Contract Documents shall include, but is not limited to: all cl... 02/16/2021
Title Site Walk Through Deadline