| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Liquid Roads Ultra Project 3/3/21 2pm Consists of approximately 384,840 Sq Ft (42,760 Sq Yd) of surface treatment, with an engineer’s esti... | 03/03/2021 | ||
| Central Avenue Sidewalk Extension 2/24/21 2pm The project consists of constructing 700+/- linear feet of new six-foot wide sidewalk, including thr... | 02/24/2021 | ||
| Lakeview Smiles 3/1/21 5pm This is a new ground up construction project in Lakeview. The building is about 4700 square ft. | 03/01/2021 | ||
| US199 Rogue River to Applegate 3/11/21 9am The Work to be done under this Contract consists of the following: 1. Install and maintain temporary... | 03/11/2021 | ||
| Message Sign Upgrades Project 2/25/21 9am The Work to be done under this Contract consists of the following: 1. Install temporary traffic cont... | 02/25/2021 | ||
| 2021 Misc Overlays 2/24/21 10am The work under this project includes all material, labor, and equipment necessary for paving, perman... | 02/24/2021 | ||
| Hamrick Rd Signal & Construction 3/11/21 2pm There are two projects associated with this RFP. The first is a signal modification and turn lane e... | 03/11/2021 | ||
| USPS Main Post Office 2/23/21 4pm The project involves the renovation of approx. 2,703 SF of unused basement space for USPIS Domicile ... | 02/23/2021 | ||
| 2021 District 7 Azalea MIM Paving 2/18/21 3pm Cold plane pavement removal of asphalt concrete surface, furnish and place emulsified asphalt tack c... | 02/18/2021 | ||
| Express Transport TI 2/17/21 4pm Tenant improvement of 2,963gsf on the second floor of an existing two-story retail building shell in... | 02/17/2021 | ||
| Title | Site Walk Through | Deadline |