| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| MWMC Poplar Harvest Services 4/16/21 12pm The MWMC requires the services of a business (or sub-contracted businesses) that has capability in t... | 04/16/2021 | ||
| On Call Park Mowing 3/22/21 2:30pm Mow, weed, and trim the following Parks weekly from March 29, 2021 to October 28, 2022 (weather and ... | 03/22/2021 | ||
| Dollar General Christmas Valley 3/29/21 4pm Trades include, but are not limited to: Staking, Erosion Control, Concrete, Polished Concrete, Mason... | 03/29/2021 | ||
| Rainbow Lane Improvements 3/25/21 2pm Pave Rainbow Lane from Jacobson Way through to Stanley Lane (approx linear 818 ft) install 120 linea... | 03/25/2021 | ||
| Jacoby Creek Underground Waterline 3/25/21 1pm New fire domestic waterlines from Old Arcata Road to the new fire hydrant at the southeast cormerof ... | 03/25/2021 | ||
| Gilkey Hall Design Services 3/23/21 2pm Schematic Design, Design Development, Construction Documents, Permitting, Bidding, Construction Admi... | 03/15/2021 | 03/23/2021 | |
| Newport Corridor Improvements Plumbing 3/25/21 2pm Plumbing sub-bids for the Newport Corridor Improvements Project , a multi-year, multi-segment, proje... | 03/25/2021 | ||
| Newport Corridor Material Testing 3/25/21 2pm Material Testing sub-bids for the Newport Corridor Improvements Project , a multi-year, multi-segmen... | 03/25/2021 | ||
| Canal Commons II 3/29/21 2pm Phase 2 includes, but is not limited to: concrete framework, reinforcement, cast in place concrete, ... | 03/29/2021 | ||
| Beulah Park Renovation 3/31/21 2pm Construction of approximately 3420 sq. ft. of sidewalk, ADA parking stall, and approximately 300 lin... | 03/31/2021 | ||
| Title | Site Walk Through | Deadline |