| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Remove & Replace Fence Karuk Tribe 5/3/21 5pm The Karuk Tribe requests proposals for the following Scope of Work required for the removal and disp... | 05/03/2021 | ||
| US101 MP317 Culvert Repair 4/29/21 3pm – Provide Temporary Work Zone Traffic Control. – Construct Temporary Water Management Fa... | 04/29/2021 | ||
| R4 Headquarters Frontage Improve Phase 3 Rebid 6/2/21 2pm Construct walks and driveway approaches along O.B. Riley Road, construct storm water inlet, sediment... | 06/02/2021 | ||
| R4 Headquarters Frontage Phase 2 Rebid 5/6/21 10am Construct walks and driveway approaches along Empire Avenue, install existing signs at new locations... | 05/06/2021 | ||
| OR138E Wheel Rut Patching Rebid **Cancelled** Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified Asphalt Tack C... | 04/23/2021 | ||
| ESB Ashland DMV Camera Project 4/22/21 3pm Install all cameras, mounts, cabling, electrical, and cable management items needed to run the camer... | 04/22/2021 | ||
| ESB Coos Bay DMV Camera 4/22/21 3pm Install all cameras, mounts, cabling, electrical, and cable management items needed to run the camer... | 04/22/2021 | ||
| Housing Authority Lobby Remodel 5/11/21 4pm The project consists of construction of an interior remodel and certain sidewalk inprovements at the... | 05/11/2021 | ||
| Interchange Landscape Improvements 5/6/21 2pm Construction of a new irrigation system and landscape plantings to be within the Oregon Interstate 5... | 04/20/2021 | 05/06/2021 | |
| Goodpasture Covered Bridge Roof Replace 5/12/21 10am The approximate quantities for the project are: Temporary Work Access & Containment, Lump Sum; B... | 05/12/2021 | ||
| Title | Site Walk Through | Deadline |