| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| City of Medford Service Center 5/27/21 2pm Request is for Electrical Subcontractor | 05/27/2021 | ||
| Unit 4 Fire Suppression System 6/24/21 3pm Provide a complete design package for a fire suppression system for Unit 4 turbine & generator b... | 06/08/2021 | 06/24/2021 | |
| Electric Vehicle Charging Sundial Bridge 6/22/21 3pm This project will install level III electric vehicle (EV) chargers in the Sundial Bridge parking lot... | 06/22/2021 | ||
| Table Rock Rd. Mosquito to Antelope 6/10/21 10am Grading, storm drainage, paving, permanent durable pavement markings, and other miscellaneous items.... | 06/10/2021 | ||
| John F Moehl Stadium Renovation 7/28/21 1pm The primary goal of this project is to upgrade the exterior and interior quality of the fieldhouse t... | 06/04/2021 | 07/28/2021 | |
| Student Health Center Building Add 6/15/21 1pm The project consists of an 1800 SF single story addition to the existing student health center which... | 05/25/2021 | 06/15/2021 | |
| Berkeley Park Renovation 6/3/21 2pm The scope of work for this contract includes: – Clearing and grubbing. – Site grading, e... | 06/03/2021 | ||
| WTP Emergency Backup Generator 7/20/21 5pm Purchase & install an emergency backup 30kw propane generator system to operate the water treatm... | 07/20/2021 | ||
| Irvington Pump Station Transfer Switch 6/15/21 2:30pm Removal of existing switch gear and installation of new 480-volt, 3 phase, 1000 ampere switch gear a... | 05/27/2021 | 06/15/2021 | |
| D7 SB Canyon Mountain MIM Paving 5/26/21 3pm Complete Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified Aspha... | 05/26/2021 | ||
| Title | Site Walk Through | Deadline |