| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Sidewalk Construction Eugene Airport 5/18/21 2:30am Work includes construction of a sidewalk (approximately 3200 SF) from the Eugene Airport economy par... | 05/18/2021 | ||
| Biddle Road Paving 5/10/21 3pm Inlay Pavement preservation two inches deep. -Striping -Signal Loop Replacement | 05/10/2021 | ||
| Maslow Parking Lot Rebid 6/29/21 2pm The project includes erosion control; demolition and removal of site features; general excavation; s... | 06/14/2021 | 06/29/2021 | |
| East Gym Parking Lot Improve 5/26/21 2pm The project includes erosion control; demolition and removal of site features; general excavation; s... | 05/10/2021 | 05/26/2021 | |
| NE Negus Way & 17th Improvement 5/26/21 2pm Contract is estimated to be between $2,000,000 and $3,000,000. The Work will consists of, but not be... | 05/26/2021 | ||
| Facility Plan & Optimization Study 5/28/21 4pm The consultant shall provide adequate personnel and resources to accomplish an updated and complete ... | 05/28/2021 | ||
| Jail Video Surveillance System 5/14/21 5pm The Scope of Work is based on 4 main goals: 1. Design, plan and deploy a new Video Management System... | 05/14/2021 | ||
| Redwood Highway Waterline Replacement 5/25/21 2pm Furnishing all labor, equipment and materials necessary to replace the existing 4‐inch Water Mains a... | 05/14/2021 | 05/25/2021 | |
| Wastewater Rehab Harlow Manholes 5/13/21 2pm This project is for the elimination of groundwater infiltration and inflow into the public collectio... | 05/13/2021 | ||
| Taxiway A Reconstruction 5/27/21 10am The scope of work being considered is: 1. Reconstruction of Taxiway A (Approximately 12,500 SY); 2. ... | 05/13/2021 | 05/27/2021 | |