| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| R4 Headquarters Lawn & Gravel 5/24/21 1pm Removal and disposal of existing lawn areas, 24″-30″ boulder placement with ODOT furnish... | 05/24/2021 | ||
| Redmond Muni Airport Rehab 6/17/21 1pm The project consists of the pavement rehabilitation of Taxiway ‘F’ (mill and overlay), shoulder grad... | 06/02/2021 | 06/17/2021 | |
| Lakeport Blvd. Sewer Rehab 6/10/21 2pm Construction of 8-inch and 10-inch sewer main, manholes, cold plane pavement removal, and asphaltic ... | 06/01/2021 | 06/10/2021 | |
| Plan & Design New Classroom Building 5/27/21 2pm Planning and design of a New Classroom Building on the campus of the Crook County High School in Pri... | 05/19/2021 | 05/27/2021 | |
| Currin Substation Design 6/9/21 2pm EWEB is replacing the Currin Substation, originally built in 1962 and included 115kV and 69kV transm... | 06/09/2021 | ||
| I-5 MP159 Culvert Repair 6/2/21 3pm The work includes Work Zone traffic control, construction of temporary water management facilities, ... | 06/02/2021 | ||
| Cedar Links Park Landscape & Irrigation 6/1/21 2pm Construction of park irrigation system and landscaping | 05/19/2021 | 06/01/2021 | |
| Maintenance Yard Electric Gate 5/27/21 3pm Install a new automatic electric gate opener system for the existing cantilever style manual sliding... | 05/27/2021 | ||
| County Jail Roof Resurfacing 5/28/21 5pm Cleaning and preparing approximately 16,500 square feet of roof surface and install a Monolithic one... | 05/28/2021 | ||
| Re-Roof & Asbestos Abatement 6/7/21 4pm Re-Roof and abate remaining sections not replaced in 2018 | 05/27/2021 | 06/07/2021 | |
| Title | Site Walk Through | Deadline |