| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Grove Phase 2 7/14/21 2pm Construction of a 34,176SF three story multi-family residential building. The building has tuck-unde... | 07/14/2021 | ||
| Sutherlin SD Residing 7/16/21 2pm Residing of East Primary School 9 1/4 plank w/ 8″ exposure installed Install or repair existin... | 07/16/2021 | ||
| A & E Medical Complex 7/14/21 5pm The property, selected by Tribal staff for this project, will need to be surveyed to determine triba... | 07/14/2021 | ||
| US101 Big Creek Bridge 7/22/21 9am 1. Construct Replica Historic Bridge Railing. 2. Temporary Traffic Control | 07/22/2021 | ||
| City of Bend Signal Upgrades 7/15/21 9am 1. Install traffic signal modifications at nine different locations within the city of Bend. 2. Inst... | 07/15/2021 | ||
| OR36 Indian Creek Bridge 7/15/21 9am 1. Install and remove temporary traffic control and erosion control measures. 2. Install and remove ... | 07/15/2021 | ||
| Fowlers Campground Tree Removal 7/20/21 10am The Shasta-McCloud Management Unit is requesting a logging company or tree service to remove 170 tre... | 07/20/2021 | ||
| Madrona #2 Sewer & Pavement 7/20/21 2pm Removal and preparation of street, prepare and pave back 750 tons of Level 2 HMAC, replacement of 59... | 07/09/2021 | 07/20/2021 | |
| Gym Facility Remodel 8/6/21 4pm 5,824 square foot project converting the Karuk “Old Gym” into a community center, kitche... | 07/07/2021 | 08/06/2021 | |
| South Umpqua HS Covered Walkway 7/8/21 2pm Work on this project consists of the remodel and enclosure of an existing covered walkway on the sou... | 06/24/2021 | 07/08/2021 | |