| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| US97 OR58 Cal Border Project 9/2/21 9am 1. Seismic retrofit for 6 bridges. 2. Bridge replacement. 3. Bridge approach roadwork including grad... | 09/02/2021 | ||
| I-5/OR138 Curb Ramps 7/29/21 9am 1. Install temporary traffic control devices as shown. 2. Construct ADA Ramps at corners specified i... | 07/29/2021 | ||
| West Lane Co. Curve Warning Upgrades 7/29/21 9am Sign Installation | 07/29/2021 | ||
| Withycombe Hall Renovation 8/3/21 2pm Oregon State University is conducting a competitive ONE OR TWO-STEP Request for Proposals process to... | 08/03/2021 | ||
| Solar Photovoltaic Power Systems 7/29/21 3pm The project will install solar photovoltaic (PV) power generation systems on existing metal roofs at... | 07/20/2021 | 07/29/2021 | |
| North Collier Street Improvements 7/27/21 2pm a. Construct new street improvements along North Collier Street including approximately 1,800 lineal... | 07/27/2021 | ||
| Osbourne ADU Addition 7/20/21 4pm Project includes following scopes of work: Demolition, concrete, framing labor, siding labor, roofin... | - | ||
| RFP Engineering Consulting Services 7/27/21 2pm Retain a qualified engineering consultant to provide professional services related to landfill devel... | 07/27/2021 | ||
| Remove & Replace Carpet Lava Beds 7-15-21 2pm Remove and Replace carpet in the Headquarters and Inter-Agency Fire Cache building and the Visitor C... | 07/15/2021 | ||
| Parking Structure Security Upgrades 7/29/21 2pm Fencing, overhead coiling grille, and modification to existing storefront systems. | 07/20/2021 | 07/29/2021 | |
| Title | Site Walk Through | Deadline |