| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| City Council Chambers 8/26/21 2pm Construction of a wooden dais, ramp, 2 tread stairs, interior wall partitions, cabinetry, and electr... | 08/19/2021 | 08/26/2021 | |
| Klamath Falls Pavement Rehab 9/9/21 1pm Pavement Maintenance & Rehabilitation | 09/09/2021 | ||
| Paving Restoration Pilot Butte 8/31/21 2pm Paving Restoration including removing overburden materials; asphalt milling and removal; base gradin... | 08/31/2021 | ||
| Canby & East St. Watermain Replace 8/26/21 2pm Construction of 8 inch potable waterline, tunneling/boring and jacking, construction of potable wate... | 08/26/2021 | ||
| Marshfield HS Stadium Reroof & Video 8/19/21 2:15pm Removal and replacement of the existing built-up roof system on the MHS North Stadium Building. Work... | 08/12/2021 | 08/19/2021 | |
| OR126 Pedestrian Improvements 8/17/21 2pm ODOT is seeking one qualified contractor to install pedestrian safety improvements on OR126B in Spri... | 08/17/2021 | ||
| Repair of Tower Simulator System Exterior 9/7/21 10am This project involves removal and disposal (approximately 7600 SF) of existing 4 ft. wide panel sidi... | 08/24/2021 | 09/07/2021 | |
| Guardrail Repair Crater Lake 8/27/21 4pm Repair and replacement of segments of highway guardrail within the park boundary. The existing guard... | 08/27/2021 | ||
| Chamberlain & Harnish Parks Seal Coat 8/18/21 10am Crack Seal, Seal Coat, Striping | 08/18/2021 | ||
| BLM Lakeview District Facilities 8/19/21 5pm Repair and maintenance of Lakeview District facilities, in accordance with the following Price Sched... | 08/10/2021 | 08/19/2021 | |
| Title | Site Walk Through | Deadline |