Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
On Call Park Mowing 3/22/21 2:30pm
Mow, weed, and trim the following Parks weekly from March 29, 2021 to October 28, 2022 (weather a... |
03/22/2021 | ||
|
Dollar General Christmas Valley 3/29/21 4pm
Trades include, but are not limited to: Staking, Erosion Control, Concrete, Polished Concrete, Ma... |
03/29/2021 | ||
|
Rainbow Lane Improvements 3/25/21 2pm
Pave Rainbow Lane from Jacobson Way through to Stanley Lane (approx linear 818 ft) install 120 li... |
03/25/2021 | ||
|
Jacoby Creek Underground Waterline 3/25/21 1pm
New fire domestic waterlines from Old Arcata Road to the new fire hydrant at the southeast cormer... |
03/25/2021 | ||
|
Gilkey Hall Design Services 3/23/21 2pm
Schematic Design, Design Development, Construction Documents, Permitting, Bidding, Construction A... |
03/15/2021 | 03/23/2021 | |
|
Newport Corridor Improvements Plumbing 3/25/21 2pm
Plumbing sub-bids for the Newport Corridor Improvements Project , a multi-year, multi-segment, pr... |
03/25/2021 | ||
|
Newport Corridor Material Testing 3/25/21 2pm
Material Testing sub-bids for the Newport Corridor Improvements Project , a multi-year, multi-seg... |
03/25/2021 | ||
|
Canal Commons II 3/29/21 2pm
Phase 2 includes, but is not limited to: concrete framework, reinforcement, cast in place concret... |
03/29/2021 | ||
|
Beulah Park Renovation 3/31/21 2pm
Construction of approximately 3420 sq. ft. of sidewalk, ADA parking stall, and approximately 300 ... |
03/31/2021 | ||
|
Coos Bay North Jetty Repair 3/23/21 10am
Includes toe, side slope, and crest repair construction above -18 feet NAVD88 elevation along 2,0... |
03/23/2021 | ||
| Title | Site Walk Through | Deadline |