| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Manhole Rehabilitation 12/1/21 2pm Contractor shall rehabilitate 26 manholes over a two-year period. The rehabilitation will be done wi... | 10/27/2021 | 12/01/2021 | |
| Roy Avenue Waterline Improvements 11/2/21 2pm Construction of approximately 360 LF of 8-inch ductile iron water main to replace an existing 2-inch... | 11/02/2021 | ||
| Wastewater Master Plan Rebid 12/16/21 2pm Establish a contract for engineering and related services between the highest ranked proposer and th... | 12/16/2021 | ||
| Rescue Building Foundation 10/25/21 9am Concrete foundation framing and foundation construction for a 36×60 pre-fab metal building in t... | 10/25/2021 | ||
| Lane Co Energy Savings Contract Services 11/18/21 3pm Providing comprehensive energy and water management services and related capital improvements for an... | 11/18/2021 | ||
| Walker Elementary Add, Reno Phase 2 11/16/21 2pm A 22,600 square foot addition addition to the existing 24,650 square foot historic building. While t... | 10/26/2021 | 11/16/2021 | |
| Lakeview Water Treatment Facility 11/30/21 4pm The Project generally consists of design and construction plans and specifications to construct a mu... | 11/30/2021 | ||
| Airport Baggage System Expansion 11/17/21 2:30pm Work will involve modification of existing checked baggage inspection areas and installation of one ... | 10/28/2021 | 11/17/2021 | |
| ADA Ramps 2022 Medford 11/2/21 2pm Work consists of removing concrete sidewalks and curb & gutter, with installation of 133 new ADA... | 11/02/2021 | ||
| Dollar Tree Weed 10/7/22 4pm This phase of the project will consist of site work and building the shell of the building. Trades ... | 10/07/2022 | ||
| Title | Site Walk Through | Deadline |