| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Brushing Highway 238 MP30-31 11/23/21 3pm Clearing and brushing vegetation to improve roadway site distance. Includes clearing, trimming and r... | 11/23/2021 | ||
| Monroe & Spencer Butte MS Roof 12/14/21 2pm New roofing at Monroe and Spencer Butte Middle Schools. | 11/17/2021 | 12/14/2021 | |
| Bunkhouse at Cross Keys Hotel 11/23/21 4pm This hotel will be 3 stories tall and 29,121 SF with 50 rooms. The hotel will be wood framed with a ... | 11/23/2021 | ||
| Empire & Eastside Boat Ramp Float Re-Bid 1/25/22 2pm The project is for the fabrication and delivery of fourteen (14) aluminum boat ramp floats, as per t... | 01/25/2022 | ||
| Highway 126 Sidewalks 12/8/21 2pm Installation of approx. 13,000 SF of new concrete flatwork including sidewalk, driveways, and other ... | 12/08/2021 | ||
| Collections & Maintenance Office Remodel 12/8/21 2pm ADA accessible restroom, development of a locker room from an existing space, stair removal and floo... | 11/17/2021 | 12/08/2021 | |
| Tatum Shell Building Chipolte 11/30/21 2pm Shell building for Chipotle Mexican Grill relocate. 2300 SF Ground up to include footings, framing,... | 11/30/2021 | ||
| 17th, 19th, Mill St. Paving 11/23/21 2pm Reconstruction of 19th Ave from Oak to High. Milling of existing asphalt on Mill St from 16th to 18t... | 11/23/2021 | ||
| Josephine County Library Network 12/16/21 5pm This project seeks a WAN connection between the Grants Pass Library at 200 NW C Street in Grants Pas... | 12/16/2021 | ||
| PS#1 & PS#4 Fuel Tank Replacement 12/7/21 2pm Removal of existing underground diesel storage tank, existing day tank, and existing fuel supply lin... | 11/16/2021 | 12/07/2021 | |
| Title | Site Walk Through | Deadline |