| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Springfield Steel Structures 12/2/21 11am Fabrication of structural steel for use in Springfield Utility Board substations. | 12/02/2021 | ||
| Maintenance Hole Rehab 12/1/21 2pm Construction activity involves saw-cutting and excavating existing ACP surrounding the frame, replac... | 12/01/2021 | ||
| Medford RCU Community Complex 12/7/21 5pm The following scopes have already bid out: Div. 06 – Heavy Timber Div. 13- Metal Building Div. 31- ... | 12/07/2021 | ||
| Valley Library Roof Replace 12/14/21 2pm The Work Contract consists of replacement of low slope roofing and flashing systems; structural modi... | 12/02/2021 | 12/14/2021 | |
| Guardrail Replacement Various 12/21/21 2pm The work to be done consists of traffic control systems, removal of existing guardrail, clearing and... | 12/21/2021 | ||
| Harvey Jones Butte High Cable Repair 1/14/22 3pm Repair of an underground concentric neutral high voltage cable. | 01/06/2022 | 01/14/2022 | |
| Manila Highway Shared Use Path 12/14/21 2pm The work to be done consists of construction of a shared use path and associated facilities. The pro... | 12/14/2021 | ||
| Englund Marine 12/9/21 10am Concrete tilt building with retail floor space and attached warehouse. Interior TI portion to includ... | 12/02/2021 | 12/09/2021 | |
| Terminal Building Access Roads Project 11/30/21 3pm This project includes removal of existing trees, reconstruction of pavements and other improvements,... | 11/30/2021 | ||
| North Bend Maintenance Building Seismic 1/14/22 4pm BPA has identified the need to “Seismically Harden” the North Bend Maintenance Headquarters to withs... | 11/19/2021 | 01/14/2022 | |