| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| College Hill HS Renovation 12/21/21 2pm The project includes seismic, mechanical, and electrical upgrades, as well as renovations to existin... | 11/30/2021 | 12/21/2021 | |
| 2022 Wastewater Collection & Storm Drain 12/7/21 2pm Install 96 pipe sections with cured in place pipe liner within the city of Medford. Estimated cost r... | 12/07/2021 | ||
| Mills & Pelican Schools Roof Repair 12/16/21 2pm Generally, the work consists of reroofing 43,642 square feet of roof with TPO mechanically fastened ... | 12/07/2021 | 12/16/2021 | |
| RFP Hazardous Fuel Treatment 12/20/21 3pm The purpose of this solicitation is to create a pool of contractors qualified to treat and remove ha... | 12/20/2021 | ||
| RCC Health Professions Building K Remodel 12/15/21 2pm The Project includes but is not limited to the following: Water, sewer, gas, and electrical improvem... | 11/30/2021 | 12/15/2021 | |
| Brixner Jr. High School Seismic Retrofit 12/9/21 4pm In general, the Brixner Junior High School project may include the following components: The existin... | 11/23/2021 | 12/09/2021 | |
| US97 and US20 Bend North Corridor 3/15/22 9am The Project includes the design and construction of the transportation improvements identified below... | 11/29/2021 | 03/15/2022 | |
| Repair, Rebuild Turbine Pumps 12/13/21 3pm The City of Redding wishes to establish a contract with a qualified contractor to inspect and repair... | 12/13/2021 | ||
| A & E Deschutes Co. Public Safety Campus 12/28/21 2pm The purpose of this RFP is to select one A/E Team for the following three (3) Program Elements: 1. F... | 12/01/2021 | 12/28/2021 | |
| S Bonnyview I-5 Phase 2 Improvement 12/16/21 3pm This project will construct a modern roundabout at the intersection of South Bonnyview Road and Bech... | 12/16/2021 | ||
| Title | Site Walk Through | Deadline |