| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Plumbing Service Reconnections 12/16/21 2pm Installation of new water service pipelines between new water meter installations and existing house... | 12/16/2021 | ||
| Maslow Ductwork Replacement 12/22/21 2pm HVAC ductwork replacement, exhaust fan installation & ducting. The contractor is responsible for... | 12/10/2021 | 12/22/2021 | |
| 5 Outdoor Eating Pavilions **Cancelled** The purpose and intent of this Invitation for Bid is to obtain bids from qualified suppliers for the... | - | ||
| Knight Library Exterior Restore Phase A 1/31/22 2pm Roof replacement, exterior brick cleaning and tuckpointing, Concrete Cleaning, Sealants, Painting, E... | 12/14/2021 | 01/31/2022 | |
| Edgewood & Spencer Butte Sidewalks 12/16/21 2pm Replacement of approximately 768 linear feet of concrete sidewalk at Edgewood Elementary and Spencer... | 12/08/2021 | 12/16/2021 | |
| Weed Elementary Structural Steel 12/15/21 2pm Structural Steel | 12/15/2021 | ||
| Mohawk HS Voluntary Seismic 12/21/21 2pm Briefly, the work consists of all architectural, structural, civil, and MEP work for Mohawk High Sch... | 12/10/2021 | 12/21/2021 | |
| Metal Structures Over Playgrounds 12/22/21 2pm The projects consist of supplying and assembly of three steel buildings. Two buildings at Brockway E... | 12/08/2021 | 12/22/2021 | |
| Hollow Lane Storm Drain Project 1/6/22 3pm Replace double corrugated metal storm drain pipes with a precast reinforced concrete box culvert to ... | 01/06/2022 | ||
| Resurface Basketball Court 1/11/22 2pm Resurface and stripe the existing Enterprise Park Basketball Courts (approximately 11,500 S.F.) | 01/11/2022 | ||