| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| BLSD Infrared Heating Replacement 2/8/22 2pm Demo existing and install new infrared heating systems in Bend – La Pine Schools’ Transportation Sho... | 01/19/2022 | 02/08/2022 | |
| Ponderosa ES Drainage Improvements 2/3/22 2pm Installation of drainage improvements including, but not limited to three (3) drywells and sedimenta... | 02/03/2022 | ||
| Supply & Deliver Asphalt Oil for Chip Seal 2/2/22 2pm The Work will consist of, but not be limited to, furnishing and delivery of asphalt materials as fol... | 02/02/2022 | ||
| Winchester Bay Commercial Bldg. 2/22/22 2pm The Project consists of the construction of an approximately 4000 square foot building, along with a... | 02/22/2022 | ||
| Board of Supervisors AV System Upgrade 2/3/22 3pm The system will include voice lift, video presentation and USB connection for Zoom and/or other PC b... | 02/03/2022 | ||
| City Hall EV Charging Station 2/24/22 2pm • Install new panel and necessary equipment • Install new electric vehicle charger purchased by the ... | 02/24/2022 | ||
| Washington St. PS Pump Upgrade 2/17/22 2pm The Project is composed of replacement of four (4) large sewer pumps, replacement of two (2) small s... | 01/25/2022 | 02/17/2022 | |
| Highland – Glacier Sewer Repair 2/9/22 2pm Repair sewer main displacements in 3 locations on Highland and 2 locations on Glacier. | 02/09/2022 | ||
| North Canal Sewer Main 2/9/22 2pm Replacement of asbestos concrete sewer mainline on North Canal Blvd between Maple and Larch Avenues. | 02/09/2022 | ||
| N Pine St. Sidewalk & Path Improve 2/15/22 2pm Construction of 8-foot wide concrete sidewalk & 8-foot asphalt paths including ADA improvements,... | 01/20/2022 | 02/15/2022 | |
| Title | Site Walk Through | Deadline |