| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| 2022 Roadway Repairs 2/22/22 2pm This project consists of removal of existing ramps, curbs, and gutters, pavement removal, grinding/i... | 02/22/2022 | ||
| Multisite Painting 2022 2/24/22 2pm Preparing and painting the entire exterior of the school, along with application of water repellant ... | 02/10/2022 | 02/24/2022 | |
| 2022 Seal Coat Liquid Roads Ultra 3/11/22 1pm The 2022 Seal Coat “Liquid Roads Ultra” Project will consist of approximately 342,000 Sq... | 03/11/2022 | ||
| UO Baker Center Roof Replace Ph2 Area F 3/1/22 2pm Removal of existing roof assemblies and installation of new roofing assemblies and flashing with ass... | 02/08/2022 | 03/01/2022 | |
| Runway 16-34 Seal Coat & Guidance Sign 3/3/22 2pm The Project generally consists of minor crack repair, wide crack repair, pavement marking removal, p... | 02/14/2022 | 03/03/2022 | |
| CM/GC Phoenix Reconstruction Project 3/1/22 2pm The Southern Oregon Education Service District Requests Proposals from experienced Construction Mana... | 02/16/2022 | 03/01/2022 | |
| Elevator & Lift Maintenance 2/18/22 1pm The purpose of this RFQ is to retain professional elevator maintenance services for Oregon Tech’s Kl... | 02/18/2022 | ||
| Multi Purpose Justice Center Phase III 2/22/22 4pm The Yurok Tribe is seeking a qualified Design-Build Contractor or Contractor/Design team for design ... | 02/22/2022 | ||
| City of Oakland 5th St. Improve 3/1/22 2pm Construction of 220 feet of curb and gutter, existing road surface preparation and installation of r... | 02/15/2022 | 03/01/2022 | |
| 2022 ADA Ramp Replacement 3/1/22 2pm Removal and replacement of 14 ADA curb ramps. Work will take place along SE Pine and SE Stephens Str... | 03/01/2022 | ||
| Title | Site Walk Through | Deadline |