| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| BLSD Education Center Lighting Renovations 3/3/22 2pm Provide architectural lighting to the exterior of an historic building and a district support facili... | 02/18/2022 | 03/03/2022 | |
| BLSD Education Center Improvements 3/2/22 2:30pm Demolition and replacement of main entry exterior stairs, precast concrete wall caps, paving site wo... | 02/18/2022 | 03/02/2022 | |
| Boivin Hall Special Inspections 3/8/22 1pm The purpose of this RFQ is to engage a qualified testing agency to conduct special tests and inspect... | 02/28/2022 | 03/08/2022 | |
| SRCSD Emergency Generator 3/2/22 2pm Installation of emergency generator equipment. | 03/02/2022 | ||
| Diamond Lake Hwy 230 MP 7-10 Paving 2/23/22 3pm • Overlay Pavement preservation two inches deep. • Taper grind at the beginning and end of the proje... | 02/23/2022 | ||
| Variable Density Thinning Project 2/24/22 2pm Variable density thinning of three forest management units. | 02/14/2022 | 02/24/2022 | |
| Joseph Lane MS Multipurpose Seismic 3/10/22 2pm Douglas County School District No. 4-Roseburg (Owner) solicits proposals for a construction firm int... | 02/15/2022 | 03/10/2022 | |
| 42nd-48th Sanitary Sewer Rehab 3/2/22 2pm Sanitary sewer rehabilitation of approximately 4449 lineal feet of 27-inch diameter pipe utilizing c... | 02/14/2022 | 03/02/2022 | |
| ITB Catalina Chase Echo Fuller Hawthorne Paving 2/23/22 2pm Cold plane removal of existing asphalt surfaces. Asphalt paving. Stormwater structure modifications ... | 02/23/2022 | ||
| Dodge Alder & Memory Water Improvements 3/2/22 2pm Dodge Avenue Water Line Improvements Construct new water line improvements along Dodge Avenue from t... | 03/02/2022 | ||