| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Drinking Water Distribution System 3/31/22 2pm The work consists of replacing 6,110 lineal feet of 8” DR-18 PVC, 3,560 lineal feet of 6” DR-18 PVC,... | 03/31/2022 | ||
| Whyte TF Grandstand CMGC 4/5/22 2pm OSU is seeking proposals from general contractors to act as Construction Manager/General Contractor ... | 03/18/2022 | 04/05/2022 | |
| Lasells Stewart Ctr Mech & Roof 3/30/22 2pm The work consists of new fall protection, selective demolition, electrical, roofing/insulation syste... | 03/15/2022 | 03/30/2022 | |
| Remove, Dispose Recycle Hazardous Waste 3/28/22 2pm Successful Contractor shall furnish all labor, materials, tools and equipment to remove, recycle and... | 03/28/2022 | ||
| Vinyl Strip Shop Doors 3/22/22 2pm Work includes all materials, labor and equipment to install vinyl strip doors at existing overhead s... | 03/22/2022 | ||
| CM/GC Fleming Middle School 4/5/22 2pm The project consists of comprehensive seismic improvement of administration, library, gym, and cafet... | 03/17/2022 | 04/05/2022 | |
| McKenzie SD Grandstands & Remaining Work 3/23/22 2pm The project consists of the seismic upgrades required at existing gym / administrative areas, includ... | 03/23/2022 | ||
| Curve Warning Signs 4/27/22 2pm The Class of Work of this Project is Signing. The value for this Contract is estimated to be between... | 04/27/2022 | ||
| Fencing at Hill 900 3/29/22 2pm Approximately 405 linear feet of nine (9) gauge, galvanized non-climb 72″ tall chain link fenc... | 03/29/2022 | ||
| YMCA South Eugene 3/30/22 2pm The project consists of the construction of a new YMCA facility located at 600 East 24th, Eugene, OR... | 03/30/2022 | ||