| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Dick’s Sporting Goods 4/4/22 10am Remodel existing location. | 03/17/2022 | 04/04/2022 | |
| 2022 Pavement Maintenance Project 3/31/22 2pm Improvements generally include grind and inlay of asphalt pavement, pavement overlay, pavement grind... | 03/31/2022 | ||
| LCAC Jail North Stair Addition 4/12/22 2pm The addition consists of a secure, exterior stair of steel frame construction with steel frame roof ... | 03/29/2022 | 04/12/2022 | |
| US26 Fairview & Idlewood ADA Ramps 3/29/22 2pm Work includes removal of existing concrete sidewalk, sidewalk ramps, curbs, asphalt and constructing... | 03/29/2022 | ||
| Aquatic Weed Control 4/19/22 2:30pm Control of aquatic invasive weeds on an as needed basis in a manner consistent with the City of Euge... | 03/30/2022 | 04/19/2022 | |
| Fulton Shop Building Reroof 4/12/22 2pm Removal of approximately 30,000 square feet of asphalt composition roofing and the installation of a... | 03/23/2022 | 04/12/2022 | |
| Sewer Interceptor Improvements 4/19/22 2pm The Project consists of constructing ±6,350 feet of 24-inch sewer main, ±725 feet of 18-inch sewer m... | 03/22/2022 | 04/19/2022 | |
| Medford GA Apron Expansion 3/31/22 2pm Project work consists of, but is not limited to, the following: grading, bituminous pavement constru... | 03/17/2022 | 03/31/2022 | |
| Burney Water Meter Replacement 4/15/22 10am The Project consists of installation of approximately 380 water meters complete with AMR radio trans... | 04/15/2022 | ||
| Overlay Various Streets City of Medford 3/15/22 2pm Work to be done consists of asphalt repairs, cold plane removal of pavement overlay of various stree... | 03/15/2022 | ||