| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Awbrey Butte Distribution Improvements 5/5/22 3pm Project includes nine interrelated water improvement subprojects that will address the following: cu... | 04/12/2022 | 05/05/2022 | |
| 421 W 10th Remodel 4/5/22 5pm The project scope includes site work to prep for: Addition of shower stall to existing 2 piece bathr... | 04/01/2022 | 04/05/2022 | |
| Upper West Branch Bridge 4/26/22 1pm The purpose of this project is to fully replace the Upper West Branch Creek Bridge on Forest Route 1... | 04/26/2022 | ||
| Territorial Hwy Improve Kruger to Fir 4/28/22 3pm Designing and preparing construction drawings and specifications for pavement preservation improveme... | 04/28/2022 | ||
| Silva Theatre Sound System 5/3/22 2:30pm Provision of a sound system for the Silva Theater at the Hult Center for the Performing Arts. The sy... | 05/03/2022 | ||
| Klamath Falls Sonic Project 4/14/22 4pm Trades involved include but are not limited to; Site/Civil, Landscaping, Underground Utilities, Site... | 04/14/2022 | ||
| East Science MV Electrical Loop 4/12/22 3pm Purchase and installation of three (3) pad mount medium voltage dielectric switches, provide MV cabl... | 03/29/2022 | 04/12/2022 | |
| OR542 Curb Ramps Project 4/14/22 9am 1. Install temporary traffic control devices and pedestrian routing. 2. Construct ADA curb ramps at ... | 04/14/2022 | ||
| Margaret Keating ES Reroof 4/27/22 1pm Removal of existing built-up asphalt roofing, gutters & downspouts. New single ply roofing over ... | 04/13/2022 | 04/27/2022 | |
| Holly Theatre 4/29/22 2pm Renovations & Restoration of Historic Theatre. Trades include but not limited to: demolition, li... | 04/29/2022 | ||
| Title | Site Walk Through | Deadline |