| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| US97 Barkley Springs Bridge Paving 5/2/22 2pm Work includes cold plane pavement removal of asphalt off bridge deck and approaches and placement of... | 05/02/2022 | ||
| K Falls Mile Marker Replacement 4/29/22 10am This project scope consists of supplying all labor, material, equipment, mobilization, machinery and... | 04/29/2022 | ||
| Westholm Park Playground Drainage 5/5/22 3pm Installing 708 linear feet of storm drain pipe, 13 cleanouts, 40 square feet of concrete sidewalks, ... | 04/28/2022 | 05/05/2022 | |
| OR138 & OR234 Bridges 5/12/22 9am 1. Install temporary traffic control. 2. Perform bridge rehabilitation work. 3. Install Asphalt conc... | 05/12/2022 | ||
| System Upgrade at Former Steam Plant 5/6/22 4pm Designing and implementing a security system at the former Steam Plant in downtown Eugene. | 05/06/2022 | ||
| Airfield Electrical Lighting Materials 5/11/22 2pm Project consists of material purchases required to replace lighting associated with Runway 14-32 and... | 05/03/2022 | 05/11/2022 | |
| Hugh Hartman Mechanical Upgrade Rebid 6/1/22 2pm The scope of work will consist of disconnect and removal of two existing gas cast iron boilers with ... | 05/20/2022 | 06/01/2022 | |
| Heritage Renovation Project 5/10/22 2pm The Heritage Project will fully renovate and restore historic University Hall and Villard Hall, by e... | 04/28/2022 | 05/10/2022 | |
| South 28th Sewer Extension 5/11/22 2pm This project consists of the extension of an existing gravity wastewater pipeline along S 28th Stree... | 04/26/2022 | 05/11/2022 | |
| Provision of Electrical Components 5/5/22 2:30pm Providing switch gear, transformer, and related electrical products. This ITB does not include insta... | 04/28/2022 | 05/05/2022 | |