| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Chain Link Fence & Razor Wire 9/20/22 9am Installation of 68’ of 12’ High Chain Link Fence. Install Razor Wire at the Top of the Chain Link Fe... | 09/20/2022 | ||
| Schroeder Lane Storm Drain 9/29/22 3pm Installation and Repair of a Storm Drainage System; Consisting of Approximately, 8 Manholes, 1,825 L... | 09/22/2022 | 09/29/2022 | |
| Carter Building Demo Project 10/4/22 2pm Remove the entire existing buildings as indicated on Drawings. Demolition, removal, and proper dispo... | 09/22/2022 | 10/04/2022 | |
| Roof Renovation Larkspur Community Ctr. 9/29/22 2pm The Bend Park and Recreation District will receive Proposals for a complete roof renovation of the f... | 09/21/2022 | 09/29/2022 | |
| Fern Ridge Water Tank Construction 10/11/22 10am This project will add four – 5,000 gallon tanks next to an existing 20,000 gallon concrete res... | 10/11/2022 | ||
| Lookingglass FD Engineering Svcs. 10/6/22 4pm Lookingglass Rural Fire District is seeking proposals from firms for the architectural, structural, ... | 09/21/2022 | 10/06/2022 | |
| 17th St. Duplex Siding & Window Replace 9/29/22 2pm Work consists of the removal of existing siding and felt underlayment and the installation of new we... | 09/16/2022 | 09/29/2022 | |
| Currin Substation Rebuild 10/19/22 2pm Construction services to rebuild the Currin substation located at 0000 N. Garden Way in Eugene. The ... | 09/21/2022 | 10/19/2022 | |
| BLSD Architectural Design Services 10/5/22 2pm The District is requesting architectural services for the design and construction of these projects.... | 10/05/2022 | ||
| High Street Protected Bikeway **Cancelled** Concrete sidewalk and sidewalk ramps; Asphalt pavement repairs; Concrete traffic separator curb; Per... | 10/04/2022 | ||
| Title | Site Walk Through | Deadline |