| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Lower Deadfall Meadows Eddy Crk Trail Restore 9/12/22 3pm Lower Deadfall Meadows Trail – improve non-motorized trail access in conjunction with mitigating res... | 08/25/2022 | 09/12/2022 | |
| Maxwell Rd. ADA Improvements 9/13/22 10am Cold plane pavement removal 2 inch deep, 1,200 square yards; level 3, ½ inch, ACP Mixture, 350 tons;... | 09/13/2022 | ||
| Recreation Facility Archie Creek 9/8/22 10am Emerald Waters Pavilion: Remove and replace roof decking, roofing, fascia, existing lumber around st... | 09/08/2022 | ||
| Group 6A Piping Project 9/13/22 2pm • Furnishing, welding, installation and testing of approximately 12,510 LF of 48” Solid-Wall Pipe, w... | 08/31/2022 | 09/13/2022 | |
| I-5 MP25-24 SB Field Fence & Gates 9/7/22 2pm Remove the existing fence and install Type 2 Field Fence, with emergency gate access, located in Jac... | 08/25/2022 | 09/07/2022 | |
| Community Center Roof Rehab 9/13/22 2pm Clean and prepare existing roof for TPO membrane overlay. Clean up and remove all debris. Assess pro... | 08/31/2022 | 09/13/2022 | |
| Deschutes Co. North Campus 236 Kingwood 9/1/22 2pm Selective demolition and renovation to existing 9,240 SF building including but not limited to demol... | 08/23/2022 | 09/01/2022 | |
| Water Management & Conservation Plan 9/22/22 2pm The City of Ashland (City) is seeking Proposals for professional consultant services for Project 202... | 09/22/2022 | ||
| Dry Canyon Manhole Rehab 8/31/22 2pm Repair and rehabilitate designated manholes throughout the City’s Dry Canyon corridor through Decemb... | 08/31/2022 | ||
| North Entrance Fuels Reduction 9/6/22 5pm The National Park Service at Crater Lake National Park has a requirement to reduce the fuel load and... | 09/06/2022 | ||
| Title | Site Walk Through | Deadline |