| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| City of Phoenix Government Building 8/23/22 2pm Demolition, Surveying and Construction Staking, Site Work, Asphalt Paving and Patching, Pavement Mar... | 08/09/2022 | 08/23/2022 | |
| H2O Meter Backwash Pump SCADA Sched A 9/15/22 3pm The Project consists of installing a backwash pump, complete with valving, piping, and electrical im... | 08/11/2022 | 09/15/2022 | |
| Summit City Wastewater Study 9/16/22 4pm The City of Shasta Lake is soliciting qualifications and proposals from qualified consultants to pro... | 09/16/2022 | ||
| Waterline Improve Ochoco from Oregon to Jordan 8/17/22 2pm The City of Prineville is seeking bids to replace 1,200 lf of 6” water transmission line with the sa... | 08/08/2022 | 08/17/2022 | |
| WWTP Building Re-Roof 9/1/22 2pm Remove and re-roof the City of Shasta Lake Wastewater Treatment Plan Control Building (approximately... | 08/16/2022 | 09/01/2022 | |
| Stillwater WWTP Clarifier Floor 8/10/22 3pm Remove and replace grout flooring and clarifier rake arm scraper blade. | 08/10/2022 | ||
| Coquille Valley Hospital A & E Services 8/25/22 12pm Coquille Valley Hospital is seeking proposals from individuals, firms, teams or consultants, hereaft... | 08/04/2022 | 08/25/2022 | |
| E 8th Ave Main Replacement 8/18/22 2pm Construction and installation of approximately 740 feet of 16-inch ductile iron pipe water main alon... | 08/18/2022 | ||
| Loraine Chambers Crest Main Replace 8/18/22 2pm Construction and installation of approximately 4225 feet of 8-inch polyvinyl chloride water main pip... | 08/18/2022 | ||
| Gate Replace Hills Creek Dam 8/26/22 2pm The project includes demolition, fabrication and installation of gate trunnion end frames, trunnion ... | 08/26/2022 | ||
| Title | Site Walk Through | Deadline |