| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Sisters Elementary School 9/8/22 2pm New 78,612 SF two story Elementary school with classrooms & accessory spaces including but not l... | 08/11/2022 | 09/08/2022 | |
| Bureau of Reclamation Klamath Falls 8/19/22 5pm Commercial Drywall Finishing Level 4 finish on 35000sf of vertically installed drywal... | 08/19/2022 | ||
| Riverside Pump Station 9/13/22 2pm 1. Construct a new sewer pump station which includes the pumps, controls, piping, structure, and oth... | 08/16/2022 | 09/13/2022 | |
| Bisulfite Building Project 9/1/22 2pm The proposed work consists of site preparation, extension of utilities, and construction of a 21’-4”... | 08/12/2022 | 09/01/2022 | |
| Preserve Stone Parapets Lassen NP 9/2/22 2pm The work of this project includes removing, salvaging, cleaning, testing, and reconstructing a segme... | 09/02/2022 | ||
| Willamette Sand Media Replacement 8/16/22 2pm A. Flipping the old and new sand through the trench method. This method is use in order to not place... | 08/16/2022 | ||
| H2O Meter Backwash Pump SCADA Sched B 9/15/22 3pm The Project consists of replacing aging manual-read water meters with AMR water meters, installing A... | 08/11/2022 | 09/15/2022 | |
| Roseburg Dist Hazard Tree Removal 8/19/22 2pm This statement of work will be issued as a firm-fixed price contract for Roseburg District Hazard Tr... | 08/19/2022 | ||
| Fencing for Whiskeytown Rec Area 9/6/22 3pm Remove Old Security Perimeter Fencing and Install New Perimeter Security Fencing and Security Gates ... | 09/06/2022 | ||
| Rancheria Logging Services 8/31/22 2pm Commercial thinning (“logging”) will be focused on two areas – one immediately west of the Big... | 08/11/2022 | 08/31/2022 | |
| Title | Site Walk Through | Deadline |