| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| South 10th St. Storm Expansion 9/27/22 2pm Construction of new storm sewer lines within South 10th Street in Cottage Grove, Oregon. The work in... | 09/27/2022 | ||
| So. County Sheriff Emergency Ops Remodel 10/6/22 11am Remodel of the existing office building to be used as the Shasta County Sheriff’s South County Patro... | 10/06/2022 | ||
| CORC HVAC Replace 9/21/22 2pm This project will consist of replacing (7) existing package units with new package units (including ... | 09/07/2022 | 09/21/2022 | |
| Fred Meyer Redmond Remodel 9/14/22 5pm Project includes a new interior decor throughout the store, expansion of the grocery pickup area rel... | 09/14/2022 | ||
| JG Comm Center Office Building 10/4/22 2pm The project consists of the erection of an wood framed, slab on grade office building and separate g... | 10/04/2022 | ||
| Central Avenue Sidewalk Extension 9/22/22 2pm Construction approximately 850 linear feet of new six-foot wide sidewalk, including one ADA ramp and... | 09/22/2022 | ||
| South Hills 3rd Level Storage Tank 10/4/22 2pm Construction of a new South Hills 3rd Level Storage Tank Replacement, two identical 0.58-milliongall... | 09/07/2022 | 10/04/2022 | |
| Building C Eureka High School 9/22/22 2pm The scope of work consists of alterations to Building C, science labs, classrooms, restrooms and acc... | 08/31/2022 | 09/22/2022 | |
| Innovation Dist. Remediation Phase 1 10/4/22 2pm The services will consist of civil design, survey, contamination abatement, pyrolysis specialist, an... | 08/09/2022 | 10/04/2022 | |
| A & E Services Shasta Co. Jail 9/23/22 3pm Shasta County is seeking proposals from providers of Architectural and Engineering Services for desi... | 09/23/2022 | ||
| Title | Site Walk Through | Deadline |