| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Glendale JR/SR High Seismic 12/8/22 5pm Seismic Rehabilitation projects may include the following components: Existing roofs will be removed... | 11/17/2022 | 12/08/2022 | |
| Creekside Village Apts. Sprinkler & Fencing 11/30/22 5pm Creekside Village Apartments is a phased project with 84 units in 14 buildings – 6 units per b... | 11/30/2022 | ||
| Creekside Village Apts – Windows 11/23/22 5pm Creekside Village Apartments is a phased project with a phased project with 84 units in 14 buildings... | 11/23/2022 | ||
| District Wide Door Locks 11/28/22 2pm Design and construction administration of district wide door locks. | 11/28/2022 | ||
| Bend High School Modernization 12/5/22 2pm • Demolition of portions of the existing campus & buildings • Site utility reconfigurations and ... | 12/05/2022 | ||
| Fire Station 1201 Seismic 12/15/22 4pm Seismic strengthening for the Crook County Fire & Rescue Fire Station 1201. The building consist... | 11/28/2022 | 12/15/2022 | |
| OR58 Fix It Corridor Culverts 12/1/22 2pm Highway street and bridge construction. | 12/01/2022 | ||
| US101 MP214-218 Tree & Vegetation Clearing 11/29/22 2pm Contract to fall trees, trim tree canopy, remove brush and vegetation, chip material and treat hardw... | 11/29/2022 | ||
| Willamette High School CTE 12/20/22 2pm Eugene, Or. Pre-Bid: Mandatory 11/15 3:30pm at Willamette High School, 1801 Echo Hollow Road, Eugene... | 11/15/2022 | 12/20/2022 | |
| CM Lake Blvd Transmission Water Main 12/13/22 3pm Installation of approximately 9,400 feet of 24-inch ductile iron water main in Lake Boulevard from K... | 12/13/2022 | ||