| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Spiegelburg Track Replacement 11/17/22 2pm The work will include excavation for the lighting upgrades and the removal and replacement of the tr... | 10/28/2022 | 11/17/2022 | |
| Scenic Middle School MEP Phase 2 11/10/22 2pm Trades needed include: Demolition, Masonry, Structural Steel, Metal Fabrication, Carpentry, Insulati... | 11/10/2022 | ||
| EmX Corridor Safety Measures 11/16/22 2pm Reconstruction and replacement improvement activities for the EmX Corridor Safety Measures project. | 10/26/2022 | 11/16/2022 | |
| Accent Wall Painting OIT Klamath Falls 11/2/22 1pm Prep and paint twenty-four (24) accent walls in the Owens Hall building and Purvine Hall building, b... | 11/02/2022 | ||
| Hugh Hartman Elementary CM/GC 11/16/22 2pm 1. Provide complete and functioning Building automation system. Pneumatic controls will be replaced ... | 10/27/2022 | 11/16/2022 | |
| Rice Creek Bridge Replacement 11/16/22 8:30am Install and maintain temporary traffic control and erosion control measures, replace bridge structur... | 11/16/2022 | ||
| 5-Year Water Distribution Main Replace 11/15/22 2pm Engineering services for the City of Roseburg’s Five-Year Water Distribution Main Replacement Progra... | 11/15/2022 | ||
| ADA Ramps City of Medford 11/1/22 2pm Work includes removal of concrete sidewalks (curbs and gutters), construction of new sidewalks with ... | 11/01/2022 | ||
| Olney Pedestrian & Bike Improve 11/17/22 3pm Design development for the Olney Pedestrian & Bike Improvements. The improvements consist of a ... | 10/31/2022 | 11/17/2022 | |
| Nova Avenue Storm Drain 11/2/22 2pm 90 LF Saw Cutting of Asphalt and Concrete 1570 SF Removal of Surfacing’s (Asphalt and Concrete) ... | 11/02/2022 | ||
| Title | Site Walk Through | Deadline |