| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Blue River Boundary Retrace Survey 11/22/22 5pm The Surveyor (Consultant) will conduct a boundary retracement survey for those properties affected b... | 11/22/2022 | ||
| Crushing for LPID 11/8/22 2pm Crushing Services for the Lone Pine Piping Project Phase I. Estimated to be 20,000-25,000. | 11/08/2022 | ||
| LPID Drilling & Blasting Services 11/8/22 2pm Drilling & Blasting Services for the Lone Pine Piping Project Phase I. Project is estimated to b... | 11/08/2022 | ||
| Modoc Med Center Skilled Nurse Facility 11/10/22 3pm This project involves the design and construction of the new Warnerview Skilled Nursing Facility Rep... | 11/10/2022 | ||
| A & E Pregnancy Center of Grants Pass 11/14/22 4pm Seeking architectural, structural, mechanical, and electrical design for the Pregnancy Care Center o... | 11/01/2022 | 11/14/2022 | |
| Market & Hamehook Rd. Canal Crossing 11/16/22 2pm • Install and maintain temporary traffic control. • Remove existing pavement and base materials. • R... | 11/16/2022 | ||
| 2022 Downtown Street Lighting Infill 11/9/22 2:30pm • Connection and verification of existing power and capacity. • Installation of conduit, electrical ... | 11/09/2022 | ||
| 580 Clover Lane Charging Station 11/28/22 11:59pm Trades needed are for excavation, asphalt and retaining wall ONLY. Owner is seeking contractor to wo... | 11/28/2022 | ||
| Toyon Water Plant Demolition 12/1/22 2pm Repair of plant access road, complete legal demolition and recycling and/or legal disposal of all ab... | 11/09/2022 | 12/01/2022 | |
| Woodacre Sewer Main Replace 11/29/22 3pm This project includes the replacement of approximately 2,350 lineal feet of 6-inch sewer main with 8... | 11/29/2022 | ||
| Title | Site Walk Through | Deadline |