| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| US101 MP204-208 Tree & Vegetation Clearing 11/17/22 2pm Fall trees, trim tree canopy, remove brush and vegetation, chip material and treat hardwood tree tru... | 11/17/2022 | ||
| Carpenterville Hwy MP355 Culvert Replace 11/15/22 3pm Removal of an existing 18 inch Culvert and Replacement with new 24 inch double walled corrugated HDP... | 11/15/2022 | ||
| Spyglass Drive Paving 11/22/22 2pm Construction of concrete sidewalk access ramps, curb and gutter; Rotomilling; Asphalt Paving; Storm ... | 11/22/2022 | ||
| Klamath Co. Vehicle & Timber Storage Sheds 12/1/22 2pm Construct two new metal sheds; one for vehicle storage and, the other to shelters bridge materials. ... | 11/08/2022 | 12/01/2022 | |
| Anderson Avista Apartments 11/29/22 2pm Project includes construction of three new two-story wood frame apartment buildings, and rehabilitat... | 11/04/2022 | 11/29/2022 | |
| F-15 Static Display CM/GC 11/30/22 2pm The City of Klamath Falls received a retired F-15 aircraft from the Oregon Air National Guard to be ... | 11/09/2022 | 11/30/2022 | |
| Eugene Riverfront Parcel 3BC 11/30/22 2pm Portal is a new (4) story apartment building with a basement. The project will consist of (3) storie... | 11/30/2022 | ||
| 2022 District 7 Access Gate Install 11/18/22 2pm Install State furnished access gates at I-5: SB MP 116.2 – south of Roberts Mountain crest and... | 11/18/2022 | ||
| Landscape Maintenance Services 11/22/22 2pm The Eugene School District wishes to establish a contract with a vendor or vendors to provide landsc... | 11/09/2022 | 11/22/2022 | |
| Eagle Point HS Ag Arena 11/29/22 2pm The Arena will be an 80 by 200 foot pre-engineered metal building with a slab floor. The structure w... | 11/08/2022 | 11/29/2022 | |
| Title | Site Walk Through | Deadline |