| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Medford Water Campus Design 1/10/23 3pm Medford, Or. Pre-Bid: Non-Mandatory 11/18 11am via Microsoft Teams Contact: Brian Runyen Phone: 541-... | 11/18/2022 | 01/10/2023 | |
| Lower Trail Updates & Construction 12/5/22 2pm Update the lower trail infrastructure of the South Slough Estuarine Research Reserve in Charleston, ... | 11/17/2022 | 12/05/2022 | |
| Clark Complex ADA Modification 12/6/22 2pm This project includes the demolition of the existing parking stall and construction of a new accessi... | 11/22/2022 | 12/06/2022 | |
| Redmond Public Safety CM/GC 12/9/22 5pm The City of Redmond is requesting proposals for a Construction Manager/General Contractor for the ne... | 12/09/2022 | ||
| Madras Elementary Gym Seismic 11/30/22 2pm Seismic strengthening of the roof and existing shear walls through sheathing/fastening and foundatio... | 11/09/2022 | 11/30/2022 | |
| Outdoor Eating Spaces Lone Pine & Jacksonville 12/13/22 2pm Supply and install Two (2) Outdoor Eating Spaces approximately 40’ x 60’ each, per MSD specification... | 11/16/2022 | 12/13/2022 | |
| 37th 38th Janus Osage Sewer Extend 12/1/22 2pm Sanitary sewer construction of approximately 2652 lineal feet of 8-inch diameter PVC pipe, along wit... | 11/14/2022 | 12/01/2022 | |
| Josephine County General Hospital Demo 12/6/22 2pm Complete demolition of the “A” Street Building at the former Josephine General Hospital ... | 11/17/2022 | 12/06/2022 | |
| MCDonald’s Park Splash Pad Project 12/6/22 2pm Replace the wading pool at McDonald Park with a new splash pad, in addition to replacing the shade s... | 11/17/2022 | 12/06/2022 | |
| Winco Roseburg 12/7/22 2pm Project Consists of the Demolition of an existing Kmart and the construction of a new ground up 71,0... | 12/07/2022 | ||
| Title | Site Walk Through | Deadline |